Well, it has been a while and slowly but surely I have gotten a few more things accomplished. I was able to install, grout and seal the tile backsplash above the counters. I had to stop just past the sink because the wall is not plumb, (gotta love these old houses) so the contractor will be fixing that in Nov for us and then I will be able to finish that portion of the remodel. 



I have primed the wood trim; which will fit in the space btwn the backsplash tiles the wall and bottom of the upper cabinets, will post those pics in my next update.
I also blocked off the old in the wall shelving, I installed in the old ironing board cavity, in preparation for the walls being refloated in Nov. Still need to do more prep work on the walls and then prime the whole space before the work in Nov.

thanks for viewing and I will post more as soon as I have more to show.




















3 comments so far
dustygirl
home | projects | blog
156 posts in 69 days
posted 60 days ago
Nice job you are doing there Pat.Thanks for sharing your pictures with us and do show us how it all turns out.
-- Dustygirl Hastings,Ont. Life is too short to sit around doing nothing
3fingerpat
home | projects | blog
55 posts in 163 days
posted 52 days ago
Thanks Dusty, looks like I need to make another entry in the blog :o)
PaBull
home | projects | blog
420 posts in 229 days
posted 51 days ago
It is coming together very nice Pat!