Sunroom #2: Slow progress...
so I’ve managed to complete all of the painting in this room. The old light fixture has been removed, and is waiting on the new one to go up and in. I bought a moisture meter the other day to give myself some peace of mind before installing the laminate flooring over it….turns out I may have opened a can of worms. I got readings anywhere from an acceptible 2% all the way up to 15% all on the surface or in divots I haven’t filled in. I believe I will still drill some smal...