Basement Bathroom

Blog series by BeachedBones consisting of 3 parts so far

Part 1: Demolition

02-15-2009 05:05 AM by BeachedBones | 6 comments »

For those familiar with it, this come in the wake of a posting of mine. “Front entry Redo” http://homerefurbers.com/projects/130 So, now my bathroom is in major demo mode. I’ve pulled down the tile, drywall. Removed the tub doors, tub, toilet, vanity, mirror etc. I’ve started ripping up the layers of vinyl flooring. As far as putting things back, I’ve added some electrical. (as well as 3 more circuits for the shop) That’s about it…

Read this entry »


Part 2: Progress report

03-07-2009 11:00 PM by BeachedBones | 3 comments »

Here’s some progress pictures. Hopefully I can get the photos to work. Here’s where I started, with lovely flower tiles, holes in the wall, rusted tub, poor electrical, vinyl over sticky tile flooring, etc etc etc. Around here I was just about done all the demolition work, and went about repairing and replacing the plumbing. Now the hot water line actually goes to the Hot side of the (new) mixing valve. Novel concept eh? New sub-floor, two layers of 3/4 ply, cement board,...

Read this entry »


Part 3: Slowly closing on completion.

04-17-2009 01:12 AM by BeachedBones | 1 comment »

Here’s a couple current pictures of my project. Still to do is wainscoting and trim, storage door and storage furniture, mirrors, door T&G ceiling maybe.

Read this entry »


View BeachedBones's profile

BeachedBones

36 posts in 5345 days

View Blog Archive
Subscribe to blog entries (RSS)


By subscribing to the RSS feed you will be notified when new entries are posted on this blog.

Blog Series


DISCLAIMER: All views and comments posted by members are not necessarily those of HomeRefurbers.com or of those working on the site.

Latest Projects | Latest Blog Entries | Latest Forum Topics

LumberJocks.com :: woodworking showcase