Blog series by Dan Lyke consisting of 1 part so far |
Part 1: Destruction and construction
Just lining our closets with cedar, to make sure we don’t have moth issues, and splitting one closet into two, with an additional door into the hallway. Yes, we’re making sure that there’s still a full plasterboard firewall between the hall and the bedroom closet. Destruction and reconstruction in the hallway: And one of the closet with most of the paneling in and the hanger rod back in place, the new hanger rod is maple, the trim is birch: