double smart house #7: MArch 13th '09

Blog entry by Big Al posted 03-19-2009 01:21 AM 3738 reads 0 times favorited 1 comment Add to Favorites Watch
« Part 6: March 6th '09 Part 7 of double smart house series Part 8: March 20th 2009 »

Sorry it took me soo long to post(bought a new truck and had to go through the whole registration… then had to get my new licence testing etc.. etc… sold my car…), for those following my build.

I am still workign on interior walls. It is going slow and i realized for the past 3-4 weeks ive been owrking on interior walls. I just want to note that we get only 7h worktime per week. and if we get different lunch times then the teachers (always happens) we cant use power tools… and we only get one sometimes two teachers for roughly 12 students that have to show us what we are doign and how to do it right… in my case the teachers are almost always on the roof to make sure the steel roof is being done right. So I get alot of problem solving to do since the house is preatty complicated… and ofcourse tools get taken because there is not 12 drills (more like 2 workign ones, and i bring my own as of last week). Anyways I jsut thought I would explain why it seams i’ve been doing interior walls for the past month… be cause i have. And so with this, i give you more interior walls:

layed out lines for two walls…. ended up not having the lumber to make it so i then went over to help other people while wiating for ht elumber…. in the end we went to lunch early and the lumber arrived as I was finishing the Ice and water shield over the flat roof section.!

going to lunch…. looking at it from the back. the front is suppsoed to be at almost the same level of finish… there is the carport left to do

applying the ice and water shield. I do do the work, i jsut take a lot of pictures, even though it doesnt affect the speed, i take pics while waiting for someone or something.

http://photos-c.ak.fbcdn.net/hphotos-ak-snc1/hs018.snc1/26405807444989951377989915630182984451_n.jpg

Me and my buddy Abe framing a ceiling, and installing.



Then we framed a couple walls for a closet… turns out it wasnt laid out right (from the someone else that had left early) so Abe ended up fixing it after i left (had a n appointment)

Thats about it for that Friday…. i will have more this weekend for this friday.

Al

-- BigAl, Ontario Canada



View Big Al's profile

Big Al

59 posts in 5357 days

Entry tags/keywords

View Blog Archive
Subscribe to blog entries (RSS)


By subscribing to the RSS feed you will be notified when new entries are posted on this blog.


1 comment so far

View hardwoodflooring's profile

hardwoodflooring

68 posts in 5148 days

posted 09-20-2009 05:10 PM

The house is coming along great.

You must be signed in to post the comments.

DISCLAIMER: All views and comments posted by members are not necessarily those of HomeRefurbers.com or of those working on the site.

Latest Projects | Latest Blog Entries | Latest Forum Topics

LumberJocks.com :: woodworking showcase