Project by Kevin S Leadbeater Sr. | posted 08-14-2009 07:55 PM | 4294 views | 0 times favorited | 8 comments | ![]() |
![]() |
Have finshed 95 % of this remodel. Waitting for the custom made silstone counter top to come in.
Did the trear out ou the drop ceilling, and and old bench at the end of the tube. built in two wall nitches a knee wall a bench with storage underneith. tile the Walls with 4×4 stone. Replace window. And Most of all Built Custom Vainities, Medince cabinets, and a Bi-fold door from Hard Maple and 3/4 prefinshed Brich PLY.
More pictures of this job can be seen at www.KevinsCustomWoodworking.com
-- Kevin S. Leadbeater Sr., Palm Harbor, Fl. www.kevinscustomwoodworking.com
8 comments so far
Beginningwoodworker
home | projects | blog
204 posts in 5157 days
posted 08-15-2009 05:11 PM
Thats a nice job.
-- CJIII
Todd Thomas
home | projects | blog
735 posts in 5389 days
posted 08-15-2009 07:31 PM
nice job…good looking tile work…....well done
-- Todd- Oak Ridge, TN
BH
home | projects | blog
41 posts in 5211 days
posted 08-18-2009 03:01 PM
Great job on the wall tile. The whole project looks very nice!
3fingerpat
home | projects | blog
86 posts in 5530 days
posted 08-23-2009 05:46 PM
I agree with everyone about the tiling, excellent work.
sandhill
home | projects | blog
71 posts in 5142 days
posted 08-24-2009 12:07 AM
Very nice job. Nice design as well.
PaBull
home | projects | blog
694 posts in 5596 days
posted 08-25-2009 01:19 AM
I like the colors and the detail. Nice job.
(but where are the outlets?)
Kevin S Leadbeater Sr.
home | projects | blog
7 posts in 5151 days
posted 08-25-2009 03:04 AM
If you look at the pic of the vanity one is on the right end below the Ridgid battery charger. the other is just to the right of the 4gang switch bank.
-- Kevin S. Leadbeater Sr., Palm Harbor, Fl. www.kevinscustomwoodworking.com
hardwoodflooring
home | projects | blog
68 posts in 5141 days
posted 09-09-2009 01:14 PM
Great job. I love the tile job on the wall.