Courtyard Marriot ballroom remodel, Old Town San Diego

Project by Jeremy Hilll posted 08-31-2009 08:40 AM 3055 views 0 times favorited 1 comment Add to Favorites Watch

Here we removed a two 12’ shear walls on the ground level, cut 2’x4’ holes into the parking garage below and installed a 5 piece moment frame to the floor of the second floor above. The steel and concrete work was subbed out, but my partner and I were responsible for managing the entire scope of the project. Once the moment frame was in place, we framed and hung the rock. I’m not really interested in slinging mud much theses days, so we found someone to handle that as well. I spent that time ripping/routing/sanding/mixing stain to match and applying a couple coats of poly to the red oak base and chair rail the wraps the room. Also had to cut down and rebuild the 10’ door that hides the sliding air wall. Looks like it was meant to be there all along.

-- [email protected]



View Jeremy Hilll's profile

Jeremy Hilll

1 post in 5141 days

Embed This Project

HomeRefurbers Code

HTML Code

URL/IMG Code

Preview this project card


1 comment so far

View Todd Thomas's profile

Todd Thomas

735 posts in 5397 days

posted 09-04-2009 12:23 PM

looks good….sounds like an interesting project

-- Todd- Oak Ridge, TN

You must be signed in to post the comments.

DISCLAIMER: All views and comments posted by members are not necessarily those of HomeRefurbers.com or of those working on the site.

Latest Projects | Latest Blog Entries | Latest Forum Topics

LumberJocks.com :: woodworking showcase