Total gut job

Project by Royalwoodworker posted 05-13-2010 04:26 AM 2349 views 0 times favorited 1 comment Add to Favorites Watch

Here is my 2009 summer project in my bathroom that took about 6 weeks and 300 hrs of work and a cost of about $7000 bucks. I did all the work pictured with a little help from an electrical friend. Anyway, the floor under the toilet was giving way after many years of leaking and previous owners trying to fix the weakened joist. Also, the plumbing inside the shower wall began to leak and I discovered the previous homeowner GLUED the copper together…didn’t last too long.

Anyway, I Liquid nailed, sistered, carriage bolted and bridged all the joist. It is built like a tank now with 2- 3/4 sheets of ply on top. I put all new copper plumbing in for the entire bath and kitchen since it butted up to it as well. New electrical outlets were added in all adjacent rooms since the walls were down. Kitchen got 3 outlets and a future expansion utility box, hallway and bedroom got outlets as well. I also love my led GFI that turn on at night and all my fixtures are on dimmers and timers.

Besides that, I added a window and a skylight and the light from both is AMAZING!!!!! Previous owners covered the window and sided over it!!!!! About $1200 in travertine and granite countertops round out the project, oh, and Kohler fixtures as well.



View Royalwoodworker's profile

Royalwoodworker

7 posts in 3842 days

Project tags/keywords

bathroom

Embed This Project

HomeRefurbers Code

HTML Code

URL/IMG Code

Preview this project card


1 comment so far

View Todd Thomas's profile

Todd Thomas

735 posts in 4329 days

posted 05-13-2010 06:25 AM

looks good…well done

-- Todd- Oak Ridge, TN

You must be signed in to post the comments.

DISCLAIMER: All views and comments posted by members are not necessarily those of HomeRefurbers.com or of those working on the site.

Latest Projects | Latest Blog Entries | Latest Forum Topics