HomeRefurbers

How to match 4'x8' sheathing on 16"O/C studs

« back to Home Building & Construction forum

Topic by Racer2007 posted 04-26-2019 08:25 PM 2519 views 0 times favorited 2 replies Add to Favorites Watch
View Racer2007's profile

Racer2007

8 posts in 4403 days

04-26-2019 08:25 PM

Topic tags/keywords: question siding

I am going to build a 6’x8’ shed with 16”O/C studs but I have a measuring problem . When I draw this out in sketch up I keep coming up with studs that don’t end up with the proper spacing to allow the sheathing to be nailed to them ,it keeps coming up 3/4”short so I would have to add another stud at the joint to nail the sheathing.
The only way I have found to make the seams match is to make the first stud 15 1/4” O/C and then the rest 16’ , is this normal or am I missing something?



View nicky269's profile

nicky269

8 posts in 1415 days

05-11-2019 12:20 PM

View sofygrass's profile

sofygrass

2 posts in 1338 days

08-05-2019 10:23 AM

Buy Generic Drugs From Trusted Online Store. We offer wide range of Cheap Generic Product & OTC Drugs. strapcart is very Trusted Online Pharmacy In USA

You must be signed in to reply.

DISCLAIMER: All views and comments posted by members are not necessarily those of HomeRefurbers.com or of those working on the site.

Latest Projects | Latest Blog Entries | Latest Forum Topics

LumberJocks.com :: woodworking showcase